Set Up Kantata for a Consulting Firm: A 2026 Build Guide

How to structure a Kantata (formerly Mavenlink) workspace for a consulting firm in 2026 — project templates, role-based rates, budget tracking and

· By Ace · Updated

Kantata

Kantata — the product formed when Mavenlink and Kimble merged — is the professional-services platform that consulting firms reach for when the spreadsheet-and-generic-PM-tool arrangement stops telling them the truth about margin. It is also the tool most often bought and then left half-configured, because its power sits in objects that a generic PM tool does not have: roles, rate cards, planned-versus-actual effort by role, and invoicing against a single project ledger.

This guide is the build order for a consulting firm starting from an empty account. It assumes you already decided to buy; if you are still choosing, best PM software for consulting firms is where that decision belongs, and our Kantata review covers what the platform is and is not good at. What follows is the sequence that gets a firm to “one client engagement’s margin visible before the invoice goes out” in a specific, defensible order — with the configuration decisions that are painful to reverse flagged as you go.

What you should have at the end

Be concrete about the target state before touching settings. A consulting firm’s Kantata workspace is finished when all five of these are true:

  1. Every engagement is one project, with a template-generated task plan and a named account.
  2. Every person is assigned a role on that project, not just a title — because rates attach to roles, and profitability is role-weighted.
  3. Planned effort is set in hours per role before work starts, so “over budget” can be measured rather than asserted.
  4. Actual time flows into the same project ledger from timesheets, not from a separate time product.
  5. One invoice per period can be produced from that ledger, with the work-in-progress reconciliation visible.

If your firm cannot say yes to all five, it is paying for Kantata and using it as a task board.

Prerequisites: settle these before you build

Three decisions made too late will force a rebuild. Make them first.

Billing model per engagement. Fixed fee, time and materials, retainer, or a mix. Kantata can hold all of them, but the template differs, and firms that template for time-and-materials and then try to run fixed-fee retainers end up with a project that reports revenue nobody recognises.

Rate structure. Decide whether rates are attached to roles, to people, or to rate cards per client. The cleanest consulting setup is rate cards keyed to roles (Partner, Principal, Senior Consultant, Analyst), with per-client overrides only where a contract requires them. If you build rates onto individual people first, every promotion becomes a project-by-project edit.

Who owns time entry. If time is not submitted weekly, actuals lag, margin reports lie, and finance stops trusting the tool within one quarter. This is an organisational decision with a tool consequence: the timesheet approval path has to have a named approver per project.

Step 1 — Set the account structure and fiscal calendar

Create the account, set the currency and the fiscal year start explicitly. Consulting firms on a non-calendar fiscal year discover late that their reporting boundaries do not line up with Kantata’s defaults, and every “year to date” view then needs a manual adjustment.

Then set up accounts (clients) and, under each, the projects that belong to them. Do not model an engagement as a folder of projects — a consulting engagement has one plan, one budget and one invoice ledger, and splitting it into four projects to represent four workstreams destroys the rollup that is the reason to buy a professional-services tool.

Add departments or practices if you report by practice line (strategy, implementation, managed services). This is the dimension most firms forget on day one and then wish they had, because “which practice is losing money” is the question a managing partner asks first.

Step 2 — Build roles and rate cards before you touch a project

Kantata’s profitability model is role-weighted, so this is the load-bearing step.

  1. Define roles your firm actually bills by — four to six is right for most consultancies. More than eight and assignment discipline collapses.
  2. Attach billable rates to roles, both a bill rate (what the client pays) and a cost rate (what the role costs you fully loaded, including overhead). If you only configure bill rates, the platform can tell you revenue but not margin, which defeats the purpose.
  3. If clients negotiate rate cards, create per-account rate cards that override the defaults. Keep the override list short and review it at renewal; a rate card nobody can reconcile is worse than a discount.

Do this before the first template, because templates reference roles. Publishing a template against placeholder roles and retrofitting the rate card afterwards is the most common cause of a Kantata rebuild.

Step 3 — Build one project template, properly, then clone it

Start with the engagement type that represents the most revenue, not the most interesting one. For most consultancies that is the standard fixed-fee implementation or diagnostic.

Inside the template:

  • Phases that match how the client buys the work — Discover, Design, Build, Handover is more useful than a flat task list, because progress conversations happen at phase boundaries.
  • Tasks per role, so assignment is a role decision rather than a name decision. A task that says “Senior Consultant: draft current-state assessment” is assignable on day one of any engagement.
  • Planned hours per task, summed to a planned-effort total per role. This is what turns Kantata from a tracker into a forecasting tool: without planned hours, every “are we over budget?” question becomes an opinion.
  • Milestones at billing points if the engagement invoices on delivery rather than on time.

Build exactly one template well. A firm with one disciplined template and four ad-hoc guesses is worse off than a firm with one template that everyone actually uses — and the second and third templates should be created by copying an engagement that worked, not by staring at a blank canvas.

Step 4 — Wire time entry and approval

Turn on timesheets, and set the submission cadence to weekly with a hard cut-off and a named approver per project. Configure the timesheet to require a task and a role allocation rather than a free-text note, because free-text time cannot be reported on and will be quarantined by finance within a month. If you are weighing native timesheets against a dedicated tracker, time tracking in PM tools covers where each approach breaks.

The failure mode to avoid: letting time be entered at “project” granularity because the task list is too granular. If people cannot find the right task in five seconds, they will pick the first one, and your task-level actuals become noise. Test this by entering one week of real time yourself, on a real project, before rollout.

Step 5 — Set up budget tracking and the margin view

Now connect planned effort to money:

  • Budget = planned hours × cost rate, plus any fixed expenses you intend to track.
  • Burn = actual hours × cost rate, from approved timesheets.
  • Margin = invoiced (or recognisable) revenue − burn.

Decide which of these three you will look at weekly, and who is responsible for looking. A consulting firm that reports all three but reviews none is in the same position as one that reports none — the mechanism that makes Kantata useful is a scheduled review that produces an action, for example “this engagement is at 78% burn and 60% delivered, so we re-scope before phase three”.

Step 6 — Invoicing from the same ledger

The final step is the one that justifies the seat price in most business cases: invoicing the client from the same records that hold the time. Configure the invoice template per account, choose the billing basis per project (actual time, fixed fee milestone, or retainer draw-down), and reconcile work-in-progress before the first real invoice so you know the ledger’s unbilled number matches your expectation.

Do the first invoice while you still have time to be wrong about it. A firm that discovers its billing basis was configured as time-and-materials on a fixed-fee engagement usually discovers it a month later, after the client has received the document.

Step 7 — Report by practice and by client, and lock it down

Once there is a month of real data, build two views and stop: margin by client and utilisation by role. Anything beyond that is a report nobody will read.

Then address permissions. Roles that only need to see their own time should not see firm-wide margin; account managers should see their accounts and not others. Kantata’s permission model is capable enough that firms frequently over-grant simply because the defaults look reasonable during setup.

The trap that bites in year two: hours do not leave with the person

This is the configuration issue worth reading before you sign, because it is not fixable by better setup. In a billable-hours business, the value of a project management platform is partly as a ledger of record — the historical account of what was delivered and what it cost. When someone leaves, that history should stay.

Practitioners report that this is not universally true. An agency owner using Asana described the problem precisely, and the principle applies to every tool in this category including Kantata:

“Actual Time should be immutable. Time tracking is often used to track billable hours. Billable hours should never walk out the door with former staff.” (Asana Forum, 2026-03-11)

The pragmatic rule for a Kantata build: before you remove a departing consultant’s account, export their time records for any open or recently closed engagement, and confirm whether deactivation or removal preserves their actual hours in the project ledger. Do this with a test user in a sandbox, not with your first leaver. Kimble’s professional-services model is built around resource and revenue history, so the expectation is that historical time stays attributed — but a firm that assumes it without checking is running its revenue history on an assumption.

The second trap is the trial-to-paid transition, which in this category is an access problem rather than a price problem. Users report that platform-initiated trials end by locking projects rather than downgrading features, and that restoration runs through a sales contact form. One account described it as: “Our trial expired yesterday and I expected the account to just drop down to the permanent free tier… Instead, our entire board has been completely locked down” (Asana Forum, 2026-06-08). For a consulting firm trialling any platform with a client engagement on it, the rule is simple: never run a live client engagement inside a trial account, and export before the trial window closes.

What Kantata costs, and what the alternatives charge

Kantata does not publish list pricing. Its plans are quoted per firm, so a per-seat number you read anywhere — including here — is not available from the vendor’s own pricing page, and any precise figure quoted online should be treated as unverified. Plan for a quoted price and ask three questions of the sales contact: minimum seats, the term length required for the quoted rate, and whether resource planning, invoicing and the analytics modules are all included or separately priced.

The alternatives are public, which makes them useful as a floor:

Asana — Personal $0 (2 users), Starter $10.99, Advanced $24.99 per user/month billed annually (monthly $13.49 / $30.49); Enterprise quoted. AI requests 5 per user/month, capped at 50 per account, then $0.50 prepaid / $0.60 metered.

ClickUp — Free $0, Core $9, Business $17, Max $100 per user/month billed annually (monthly $12 / $25 / $120); Enterprise quoted.

Avaza — Free $0, Startup $11.95 / $9.96, Basic $23.95 / $19.96, Business $47.95 / $39.96 per month, with timesheet, admin and resource-scheduling users bundled per tier and unlimited project collaborators.

Teamwork — Free $0, Basics $9.99, Accelerate $24.99 per user/month billed yearly; Optimize and Enterprise quoted.

Smartsheet — Pro $9, Business $19 per member/month billed yearly (monthly $12 / $24); Enterprise quoted.

Verified against the official pricing pages of Asana, ClickUp, Avaza, Teamwork and Smartsheet on 2026-11-10. Kantata’s own plans are quoted per firm and are not published on kantata.com/pricing, so no per-seat figure is stated for Kantata in this guide.

How to decide whether the build is worth it

Firm shape Sensible choice
3–8 consultants, fixed-fee engagements, billing from a spreadsheet Avaza Startup or Basic — timesheets plus invoicing in one subscription
10–40 consultants, role-based rates, margin reviewed monthly Kantata, built in the order above
10–40 people, client work plus a large volume of sub-hour tasks Teamwork Accelerate
Under 10, project work dominates and billing is elsewhere Asana Starter, with time tracked in a separate tool

The threshold is honest and usually around ten billable people: below it, the effort of configuring roles, rate cards and planned hours exceeds the value of the margin view, and a $9.96/user/month tool with invoicing included wins. Above it, “which engagement is losing money and who is over-allocated” becomes a weekly question, and a platform built to answer it pays for itself with one recovered engagement.

Two further reads before you commit: best PM software for agencies if your firm is closer to project work than to time-and-materials consulting, and the onboarding sequence for a client relationship in client onboarding workflow in a PM tool, with the Rocketlane-side implementation in set up Rocketlane for agencies. If you are building a repeatable client-reporting cadence rather than a one-off build, client reporting workflow in a PM tool is the next step after this guide.


How this content was prepared

Transparency note: This guide is built from (1) Kantata’s official pricing page, read on 2026-11-10, which confirms the platform is quoted per firm rather than published per seat — no per-seat price for Kantata is asserted here; (2) the published pricing pages of the comparison tools, linked in the verification block; (3) first-hand reports from paying users in the Asana community forum, quoted and linked inline where a data-retention or trial-expiry behaviour is described; and (4) our editorial judgement about build order for a professional-services firm. It is not sponsored.

We do not claim to have independently tested Kantata. We hold no paid Kantata account and have not configured a live consulting engagement in it. The build order reflects how professional-services platforms of this class are structured and what breaks when the sequence is reversed; the specific menu names in your tenant may differ, and where they do, the order of the steps is the part worth keeping. Pricing and product structure change without notice — the dated verification block and the linked vendor pages are authoritative.